No. |
Trade |
Room Name |
Level |
Type |
Date |
001 |
Plumbing |
Unit F1 505 BH Washroom |
Level 01 |
As-Built |
04/03/2025 |
Description: The vertical pipes on-site appear to be installed in the opposite orientation compared to the model.
002 |
Plumbing |
Unit C1 501 Washroom |
Level 01 |
As-Built |
04/03/2025 |
Description: As per Intent, the Vent Pipe was Supposed to get branched at Halfway, Rather On-site its branched at the Top.
003 |
Plumbing |
Unit C1 501 BH Washroom |
Level 01 |
As-Built |
04/21/2025 |
Description:
The onsite installation includes an unplanned T-connection that deviates from the Design Intent.
004 |
Plumbing |
Unit B1 503 |
Level 01 |
As-Built |
04/21/2025 |
Description:
In the model, the pipe is supposed to go backward from the elbow and then turn left, but on-site, it goes forward from the elbow before turning left.
005 |
Plumbing |
Unit 713 Washroom |
Level 01 |
As-Built |
04/21/2025 |
Description:
This Pipe was suppose to be in the center of these 2 Plumbing Risers according to Design Intent, But On-site its moved towards left.
006 |
Plumbing |
Unit 713 Corridor |
Level 01 |
As-Built |
04/07/2025 |
Description:
The Pipe seems to be an Extra one, it was not supposed to be their according to intent.
007 |
Plumbing |
Unit C2A 502 Kitchen |
Level 02 |
As-Built |
04/21/2025 |
Description:
The Pipe was supposed to be Turning Down Straight and then Connecting through an Elbow to Other as per Intent, Perhaps On-Site It is turned left and routed downwards.
008 |
Plumbing |
Unit F1 605 Behind Kitchen |
Level 02 |
As-Built |
04/21/2025 |
Description:
The sink pipe was guided to go halfway up & then turning right as per intent, perhaps onsite its installed going straight up & then turning right.